Cloud Migration & Modernization
We assess application portfolios against the 7 Rs of migration (Rehost, Replatform, Refactor, etc.), prioritize workloads by business value and risk, and execute cutovers with documented rollback procedures. Hypercare support runs for 30 days post-migration so agencies reach steady state with confidence.
Lift & Shift
Refactor
Containerization
Multi-Cloud Architecture
Avoid single-vendor lock-in while meeting agency data residency and performance requirements. We design reference architectures across AWS GovCloud, Azure Government, and Google Cloud that share a common identity plane, logging standard, and network perimeter so operators are not managing three separate environments.
AWS GovCloud
Azure Gov
Google Cloud
Infrastructure as Code
Manual click-ops is the enemy of repeatability and compliance. We replace it with version-controlled Terraform modules and Ansible playbooks that provision, configure, and patch environments from a single source of truth. Every infrastructure change passes through a peer-reviewed pipeline with automated policy gates before it reaches production.
Terraform
Ansible
GitOps
Hybrid Cloud Design
Not every workload moves to the cloud on day one. We design hybrid architectures that extend on-premises data centers into government cloud environments through dedicated connectivity (AWS Direct Connect, Azure ExpressRoute), consistent DNS, and unified identity federation , preserving investments in existing infrastructure while enabling cloud-native capabilities.
DirectConnect
ExpressRoute
Identity Federation
Cloud Security & FedRAMP
Security is not a phase at the end of a migration; it is a prerequisite for every architecture decision. We integrate NIST 800-53 controls into infrastructure design, support SIEM and SOAR deployment, and guide cloud service providers and agencies through FedRAMP authorization packages , from initial gap analysis through the ATO letter.
FedRAMP
NIST 800-53
Zero Trust
Disaster Recovery & Continuity
Federal missions cannot wait for an outage to expose gaps in a recovery plan. We design, document, and test DR strategies against defined RTO and RPO targets , including automated failover, cross-region replication, and tabletop exercises , so the plan works under real pressure, not just on paper.
RTO/RPO Design
Failover Testing
COOP